Case Study: Sizing an ORC Waste-Heat Recovery Project

Starting Point

A plant vented 2 MW of exhaust at 320 degrees C, twenty-four hours a day. The goal was power with the shortest payback.

Survey and Choice

  • Heat profile was steady, so an ORC beat a steam plant on cost and speed.
  • A siloxane fluid was chosen for the high temperature, matched to an Incoloy evaporator.
  • An isolated plate air-to-air preheater recovered part of the heat to cut fuel before the ORC loop.

Outcome

The ORC delivered about 180 kW of continuous power. Air preheat cut fuel by a further 8 percent. Combined savings paid the system back in under five years, and the isolated exchanger kept maintenance simple on the dirty exhaust stream.